logo

Practical pipeline wastewater infrastructure technology. Responsive, real-world support

Infratech Solutions helps wastewater infrastructure professionals inspect, clean, and rehabilitate difficult pipe systems with capable equipment, hands-on training, responsive service, and solutions selected for the realities of field work.

Contact Us

Top
 

EcoCure Ultra UV CIPP System

Faster, Controlled UV Curing for Gravity-Main Rehabilitation

EcoCure Ultra is a UV cured-in-place pipe system engineered to improve curing efficiency, visibility, and operational control for sewer gravity mains from 6 to 72 inches.

Built for Efficient Curing

An extendable UV lamp chain and selectable power levels help crews adapt the curing process to different liner sizes, pipe diameters, and target speeds. Typical curing operations may be completed in approximately three to five hours, depending on project conditions and liner requirements.

Extendable lamp-chain design intended to improve curing efficiency

PLC and manual control modes for operational redundancy

Front and rear heat-resistant cameras for real-time process monitoring

Multiple temperature sensors for liner-wall and air-temperature tracking

Selectable power levels for varying diameters and curing speeds

Configurations for a broad range of gravity-main rehabilitation projects

Greater Visibility From Start to Finish

Real-time camera views and temperature data give operators better insight into the curing run. The system’s dual control modes help crews maintain control if an unexpected computer issue occurs, reducing the risk of avoidable curing failure.

Plan Your UV CIPP Configuration
Talk with Infratech about pipe diameter, liner system, project volume, vehicle or trailer configuration, power requirements, training, and field support.